in Mogadishu Somalia sales price shop near me near me shop factory supplier 32*2 High Speed Weaving Machine manufacturer best Cost Custom Cheap wholesaler

  in Mogadishu Somalia  sales   price   shop   near me   near me shop   factory   supplier 32*2 High Speed Weaving Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

Much more importantly, we make unique areas according to provided drawings/samples and warmly welcome OEM inquiries. In this way, our products have continued to acquire industry acceptance and clients satisfaction above the earlier couple of a long time. we provide one-end solution for the obtain of mechanical energy transmission goods in China.

The EPT motor of PGF hi-speed knitting EPTT is used with the method of frequency conversion, which enables the stepless pace handle even for the duration of the procedure, for illustration: although the feeding breaks (finishes), the EPTT is instantly stopped even though the auto feeding gadget is used for knitting main fabirc, for each thick or slender core substance in the restrict, the delivery is uniform the EPTT is also stopped instantly whilst main breaking(finishing) to stay away from degrated merchandise. And the braided material that is manufactured with PGF hi-speed knitting EPTT is of greater qualify and a lot more trustworthy.

II, Needs AND Material OF KNITTING
PGF hello-pace knitting EPTT is able to knit curtain belt, shoe belt, cummerbund of the styles of column, pipe, and flat, and pipe-form jacket, and so on.
A variety of sorts of substance are adoptable for PGF hello-pace knitting EPTT, this kind of as cotton yarn, chemical fibre yarn, silk, soft metallic wire, and so on.

III, Attributes
PGF hello-speed knitting EPTT is of the shut framework, handy for procedure, hugely automated, fast for adjustment, reputable for operation, of reduce noise, of larger performance, of EPT quality and so on.

IV, Operation Strategies
Before commencing the EPTT, shall examine the subsequent items:
1 whether the EPTT force is proper
2 whether or not the earth unit is dependable
3 no matter whether the motor steering is right
4 clean up the desk, and other obstructions that affect the operation of the EPTT
five whether the EPTT oil is competent (oil design, oil quantity)
Once the previously mentioned things are checked and passed, adhere to up the below methods to begin the EPTT:
1 connect the EPTT (EPTT two section 380v)
two go the change of EPT box to the position of quotON quot(the EPTT supply indicator is on, which implies it is EPTTed)
3 press the begin button
4 switch the rotating-set up button clockwise
five refer to the handbook of frequency conversion EPTT to operation the EPTT.

V, Therapy FOR YARN-BREAEPT (FEPTSHING)
If the yarn breaks(finishes) while the EPTT is operating, the breaking indicator is on. Examine every yarn cop. If the yarn is damaged, pull the end of that yarn in direction of the finished knitting, and then press the startup button if the yarn cop is vacant, just take off that 1, and replace it and thread the yarn and pull the end of yarn towards the completed knitting, and then press the startup button. If the core is damaged, check the main unEPTTthe EPTT physique, and pull the stop of the main in the direction of the finished 1, and then push the button to knit.

VI, ADJUSTMENT OF Bound Speed
To adjust the speed of the top remaining EPT on the cEPTTr column can receive different velocity of certain, and distinct sheer-shape cross details of every single size in mm (or named as product density, item no.)

Refer to the underneath chart and table one for information

DIAGRAM OF Gear

Distinction desk among the sure pace of hi-speed knitting EPTT and EPT EPTTble 1
(from the remaining to the proper)
Frequency of motor: 60HzZB=30ZC=28
ZA speed of sure CM/min variety of sheer-condition cross point/CM

Frequency of motor: 60HzZB=30ZC=36
ZA velocity of bound CM/min amount of sheer-shape cross point/CM

Frequency of motor: 60HzZB=30ZC=38
ZA speed of sure CM/min amount of sheer-condition cross level/CM

Observe: Whilst the frequency of motor is not 60HZ, the pace of bound is that the benefit in the over desk instances the actual function frequency/sixty, and the sheer-condition cross level is not transformed.

VII, Servicing INTRODUCTION
For the EPTT that is currently being utilized, must lubricate its direct, spline ingot groove, and the lubrication volume can not spill above, and it is greatest to lubricate it just keeping away from dry-operating. Need to add oil on the concave ring of spline shaft, at lEPT two moments for every eigEPTT hours, a number of drops for every time.
The oil that is mainly used on the spline EPT box should be replaced totally following one particular thirty day period, and then, is to be supplemEPTTd according to oil scale amount. For the duration of the production, decide no matter whether to trade lubrication (the lubrication utilized on the EPTT is 32#) according to the oil status. Shall clear up the float on any components usually (do not do it while the EPTT is operating).

VIII, Precautions for Set up and Assembly amp Unassembled
Set up: need to set the EPTT on the rigid floor, and should maintain it in level soon after whilst installing the rear table board.
Hanging Installation: if this EPTT is moved soon after dis-packaged, whether or not for forklift or crane, the point of toughness shall alwaEPTTbe established on the decrease crosspiece unEPTTthe holEPTTof the quadrate pipe EPTT, should not on the table board of the knitting EPTT.

EPTTAL Part

Hello-speed sealing knitting EPTT Procedure handbook Complete 11 webpages
Web page 6
seven.two regular faults and solution methods for frequency conversion EPTT in beneath desk

Fault exhibit Fault material amp description Treatment methods
E.O.C.A Overcurrent in acceleration one, check out no matter whether the motor is shorted or partially shorted
2, prolong the acceleration time
three, the configurations of frequency conversion EPTT is not rational, and EPT the ability of the frequency conversion EPTT
four, minimize the torque to increase the rated worth.
E.OC.n Overcurrent in consistent speed one, check whether or not the motor is shorted, whether the output wire is insulated effectively
2, check out whether the motor is stopped to operate, regardless of whether the mechanical load waves
three, examine whether or not the ability of the frequency conversion EPTT is way too tiny, and EPT the potential of the frequency conversion EPTT
four, verify whether .the voltage of the EPTT network waves.
E.OC.d

E.OC.S

Overcurrent in deceleration
Overcurrent in halting
1 verify whether or not the wire insulation is well, whether the motor is shorted
2 EPT the deceleration time
three exchange by a frequency conversion EPTT of greater capability
four the braking capability of direct recent is too massive, and reduce the braking ability of immediate current
5 for the EPTT fault, ship back to the manufacturing facility for restore.
E.GF.S
E. GF.a
E. GF.n
E. GF.d
Shortcut to ground 1 examine whether or not the wire of motor is shorted
2 increase the EPTT community, and examine regardless of whether there is the wave of voltage
3 send again for restore
E.ou.S

E.OU.a

E.OU.n

E.OU.d

Overcurrent in acceleration
Overcurrent in deceleration
Overcurrent in continual speed
Overcurrent in deceleration
1 lengthen the deceleration time, or include with the brake resistor
2 boost the EPTT network, and check out whether or not there is the wave of voltage.
E.Fb.S
E. Fb.a
E. Fb.n
E. Fb.d
Fuse melted

If fuse melted, send out back again for mend
E.Lu.s
E. Lu.A
E. Lu.n
E. Lu.d
Low voltage 1 examine whether or not the voltage is regular
two check out whether the load waves
3 check out whether the section is lacked.
E.OH.S
E. OH.A
E. OH.n
E. OH.d
Overheat of frequency
conversion EPTT
one examine no matter whether the admirer is stopped to operate, whether the radiating piece is lined by imEPT
two check out whether or not the surroundings temperature is normal
3 check out whether the airing place is adequate, regardless of whether the air is convective
E. OL.A
E. OL.n
E. OL.d
Overload of frequency
conversion EPTT
one hundred fifty% per moment
1 examine no matter whether the frequency conversion EPTT is of smaller capacity, no matter whether is coated by imEPT
two examine no matter whether the load of the EPTT is blocked
3 V/F curve is not established properly, and shall be reset.

Hello-velocity sealing knitting EPTT Procedure handbook Overall eleven pages
Web page 7
continued

E.OA.A
E.OA.n
E.OA.d
EPT overload 150% for every one particular minute one examine regardless of whether the mechanical load moves
two the motor distribution is way too small
3 the motor is overheated, and the insulation becomes worse
4 check out no matter whether the voltage moves drastically
five check whether or not the stage is lacked
6 the mechanical load is EPTd.
E.OT.A
E.OT.n
E.OT.d
In excess of-torque of motor 1 verify regardless of whether the mechanical load moves
two check out whether the motor configuration is as well little.
E.bs.A
E. bs.n
E. bs.d
E. bs.s
The electromagnetic contactor assistant coil does not opinions. Send back for restore
E.bT.A
E. bT.n
E. bT.d
The brake transistor is broken. Speak to with the manufacturing unit.
E.EC.S
E. EC.n
E. EC.d
E.EC.A
CPU fault Make contact with with the manufacturing unit.
E.EE.S
E. EE.n
E. EE.d
E.EE.A
E Prom fault Make contact with with the manufacturing unit.
ER Exterior interference Insulation with the interference source
ES Emergency parking UnEPTTthe emergency standing
twenty four-20mA damaged circuit EPT with the previously mentioned damaged 1
Pr Miscalculation of specification set up Proper specification of setup
DCb Brake position of direct recent UnEPTTthe brake position of immediate current

Hello-velocity sealing knitting EPTT Procedure guide Whole 11 web pages
Website page eight
VIII, Crucial function, purpose screen, procedure introduction of HLPC 0D7523A EPTT operation EPTT
eight.one key function of HLPC 0D7523A EPTT procedure EPTT

one PROG programming/function show key
2 EPTTR/DISP key of information affirmation, soon after the information is amended, push this key to validate the entry of info
three up/down keys, pick specification, amend information and so on.
4 Operate demand important of procedure, start procedure
5 Stop/RESET quit/ reset essential, end operation, and the operation is disturbed, and reset
six FREQ Established frequency set up button, can established up this button in orEPTTto enter the principal frequency.

Hi-velocity sealing knitting EPTT Operation manual Overall 11 pages
Web page 9
eight.two Explanation of operate display objects

  1. T fifty. frequency charge 50. HZ
  2. F 50. rated frequency 50. HZ
  3. R 02. output of present two.0A
  4. U220 output of voltage 220V
  5. U540 immediate voltage 540V
  6. r 39. temperature 39 ordmC
  7. .001 counter
  8. L50. PID feedback is fifty%
  9. 000. managing pace
  10. Fo r positive managing
  11. r EU negative managing

Hi-speed sealing knitting EPTT Procedure guide Complete eleven internet pages
Website page 10
eight.3 Rationalization of keyboard

EPTT on #8594 display F00.(push PROG) #8594display FOR or REV (push PROG) #8594 existing C000 (the purpose code assortment interface can make use of #9661 #9651keEPTTto alter the flash digit number, the previous digit flashes) #8594 (push EPTTR) existing C000 (The first digit flashes) #8594 (press EPTTR) existing C000 (The first digit flashes) #8594 (press EPTTR) present C000, the previous digit flashes.

Case in point: c111 is established as two, as following
EPTT on #8594 screen F00. #8594 FOR #8594C000 (the very last digit flashes) #8594C001 (the last digit is transformed into one, and flashes) push EPTTR #8594C001 (The middle digit flashes) press #9651 #8594C011 (the center digit is changed into one, and flashes) press EPTTR #8594C011 (The initial digit flashes) push #9651 #8594C111 (the initial digit is modified into 1, and flashes) press EPTTR EPTT #8594present (push #9651) #8594present two (present EPTTr EPTT, and it’s alright) #8594C112

Hello-velocity sealing knitting EPTT Operation handbook Total eleven pages
Website page 11
VIII, EPT Diagram (see attachment)

VV, Comprehensive EXPLAINATION OF FREQUENCY CONVERSION EPTT

I. EPTT Introduction
The high-speed braiding EPTT employs a variety of EPTT and novel layout. 4 16-spindle braiding EPTTs are integrated into one unity. By making use of the VFD-A sort alternating current motor EPTr that is developed by way of combining the laptop manage EPT, the centralized frequency-adjust and stepless pace regulation can be recognized. The EPTT is presented with numerous kinds of computerized protective functions such as: automated quit while the line breaks, in excess of torque, in excess of voltage, unEPTTvoltage, overheating, in excess of load and so on. The EPTT also has numerous outstXiHu (West EPT) Dis.Hu (West EPT) Dis. positive aspects, for example: high rotate speed, high generation performance, small floor region, lower noise, EPTT support life and effortless operation as nicely as vitality preserving. It is the upgrading and new era product of conventional disc braiding EPTT.
II. Standard EPTnical Parameters
Rated EPTT of motor: 075W
Rated speed of motor: 1390r/min
Number of spindle: sixteen*four 960*790*seven hundred(L*B*H)
24*2 1240*620*700(L*B*H)
Specification of quill:( Phi48*one hundred sixty)mm
Spindle pace: 350r/min
Strategy of speed adjustment: frequency-modify and stepless pace regulation
III. Provider Situations
Voltage of EPTT supply: AC220V plusmn10%HUO or AC380V plusmn10%
Frequency of EPTT offer: 50HZ plusmn5%
Ambient temperature: -10 ordmC-40 ordmC(no condensation and no freeze)
Ambient humidity: unEPTT90%RH(no condensation)
Working environment: no water droplets, steam, dust and grease stain
no putridity, flammable fuel and liquid
no drifting dust and steel particle
sound base, no severe vibration
no interruption of electromagnetic sounds.
IV. Set up
4.1The gear fixture foundation are not needed for the installation of this EPTT. Only spot the EPTT on the sound and even concrete floor and maintain level with no vibration.
4.two Configuration of EPTT EPT
4.two.1 In accordance to the consumer demand, the EPTT may possibly provide high speed braiding EPTTs that are used to two types of voltage levels: 220V, 50HZ and 380V, 50HZ. The consumer shall link traces correctly in accordance to the related voltage level of bought products. Be confident no mistaken relationship so as to keep away from that the EPTT are not able to function generally or any hurt occurs.
4.two.2 When user disposes the EPTT provide of high speed braiding EPTT, please EPTTly care whether or not there is a dependable floor line in the electrical power grid (SV220VAC380V)method (i.e. Regardless of whether there is dependable grounding for socket grounded stage of EPTT supply AC220V or AV380V). If not, an extra protecting floor line for the EPTT need to be produced. Its base resistance shall not be more than four Omega. And then merge it into the grounded stage of EPTT socket (SV220V or AC380V) or inducted to the grounding finish of the EPTT directly.

4.2.3 The EPTT line connection of the EPTT is already carried out for users. The grounded phase of EPTT offer plug is rightly connected with grounding conclude of the EPTT. The person just wants to insert the EPTT source plug into the EPTT offer socket that is ready according to pertinent voltage amount to connect the recent.
4.3 In the scenario of not connecting the recent, open up the doorway of EPT control box with the provided crucial to verify whether electric powered components in EPT manage box are ruined or loosening. If the connecting line is loosening, appropriate steps ought to be carried out in time.
five.one No-load Take a look at
five.one.1 Change on the EPTT offer of EPT control box
five.1.two Flip on the change of EPTT provide inside the EPT management box. If the indicating lamp of EPTT supply on the handle panel and related indicating lamp on EPTT operator panel of frequency changer illuminate, it is indicated that almost everything is rigEPTT and no-load examination can be operated.
five.1.3 Flip the pace-regulating potentiometer of frequency setting knob on the EPT control box panel back to the scale fifty(anti-clockwise rotation). Instantaneously press the button to make the EPTT to rotate instantaneously and observe whether it is rotating clockwise or not. If not, exchange the positions of U and V of output port of frequency changer. View and ensure that the all managing is fleXiHu (West EPT) Dis.ble and sleek to guarantee no obstructions and irregular clash. If one thing improper happens, appropriate factors ought to be located in orEPTTto resolve the problem.
five.1.4 Push the startup button on handle panel, then progressively raise the managing strain of alternating motor EPTr (i.e. gradually rotate the potentiometer knob clockwise) at the same time, watch and ensure that the speeds of motor and rotation board are increasing gradually and that the working is standard.
five.one.5 Press the cease button on control panel and look at regardless of whether the motor is synchronized with the instruction. If not, the reason shall be identified in orEPTTto eliminate the fault.
five.two Load Take a look at
five.2.one Right after no-load test is concluded, the load test can be operated. Spot the braiding spindle into the desktop XiHu (West EPT) Dis.Hu (West EPT) Dis.. Equip the braiding spindle with the needed specified quill with the essential color yarn according to the extravagant yarns that will be weaved and get everything ready.
five.2.2 Switch the pace-regulating potentiometer knob on the EPT manage box panel back again to the scale , instantaneously thrust the button to change on motor and make it rotate. View that the operating of quill has impediment or clash. If one thing incorrect occurs, the explanation shall be located in orEPTTto get rid of the fault.
5.2.three Thrust the startup button and switch the pace-regulating potentiometer knob. Make the motor to maintain operating for a whilst(5~10min)in the pace of 1000r/min. If almost everything is right, reduce off a single yarn by guide. If the motor is turned off at once, it is proved that automatic stop protective unit is delicate. So, the EPTT test is finished fully. The EPTT can be place into the regular production.
VI. Certain Notices
In orEPTTto ensure the securities of men and women and products and obtain the very best service outcome, we would like to specifically rXiHu (West EPT) Dis.Hu (West EPT) Dis.d all of end users that adhering to situations must be compensated far more attentions although installing this EPTT.

six.one The workshop with the set up of this EPTT must have good ground wire with floor resistance of significantly less than 4

six.two This EPTT should be grounded independently it shall not be jointly grounded with higher electrical-present EPTTs, these kinds of as electrical welding EPTT and substantial-EPTT electrical motor. The EPTal area of ground line should be equal or far more than 4mmtwo.
six.3 Prior to this EPTT is left from the producing factory, for 108 parameters of frequency changer, adhering to 18 parameters (see desk one) need to reset according to specifications of the EPTT technological efficiency, and the other a hundred thirty parameters are all retained as what they are established at production factory. If there is no EPTT demand from customers, clients make sure you do not randomly change frequency changer parameters any a lot more.

Function code Perform Placing scope and function clarification Established value
C001 Accelerating time location .1~6500S four
C006 Intermediate voltage location .one~255/510 thirteen
C007 Intermediate frequency placing .01~600 two.5
C571 Max. frequency environment 50.~600. 50
C012 Running control setting ~two 1
C013 Managing frequency choice ~two 1
C015 Stopping way choice ~1 1
C016 Reverse turning option ~one 1
C571 Startup frequency location .one~ten 5
C571 Inching frequency placing ~600 twenty
C033 Accelerating time placing .1~6500S 3
C050 Multi-practical enter conclude FOR 1
C051 Multi-practical input stop REV 4
C053 Multi-purposeful enter conclude SPH seven
C075 Analog amount EPT environment .~600 fifty
C088 EPT rated rotate pace ~9999 270
C100 EPTT torque payment .~ten. 5

6.4 When frequency changer outputting, in output facet main circuit, alternating recent contacting place is not allowed providing and breaking EPTT source.
six.5 When the temperature in workshop surpasses forty ordmC, forced air cooling evaluate need to be adopted to EPT management box.
6.6 When above torque or other faults happen, ahead of the explanation is obvious and faults are solved, frequency changer cannot be started once more in orEPTTto keep away from bringing harm to the EPTT. The technique of restarting frequency changer is: 1. To begin with push the RESET button on frequency changer EPTT operator panel and then press the quit button on principal controlling EPT box procedure panel and lastly press the startup button two. Switch off the EPTT source in principal managing EPT box and change on once more, and then press the startup button.
six.7 When the switch of EPTT provide in EPT management box is turned off and prior to indicating lamp on frequency changer EPTT operator panel goes out, any component of circuit inside of EPT manage box cannot be touched or any assembly and disassembly and wiring can’t be done.
six.8 Soon after braiding spindle is mounted in the quill, reverse turning is not permitted any much more in this EPTT.
6.9 Max. doing work rotate pace of this EPTT is made as 350r/min, but actually cost-effective rotate pace is around 300r/min. Before this EPTT leaves manufacturing manufacturing facility, its max. operating rotate velocity is established to be restricted in economical rotate velocity scope. Consumers you should do not randomly change corresponding parameters any more to improve the pace. In this way, EPTT accident can be avoided.
six.ten This EPTT can’t run EPTT time (significantly less than 30min) at low pace of significantly less than 100r/min, or else electrical motor will be broken owing to overheating.
six.eleven It is unfavorable for this EPTT to be started out and stopped at lower or higher rotate speed (when the EPTT is commenced, if rotate pace is too reduced, commencing torque is minimal and this EPTT is tough to be started up but if rotate velocity is way too large, starting up existing is as well large and frequency changer is very easily overloaded. When the EPTT is stopped, if rotate speed is too higher, frequency changer is very easily to be over voltage. When the EPTT is commenced up, please first of all flip the knob of velocity-regulating potentiometer on EPT control box procedure panel to the scale 50 (about 100r/min) and then push the startup button. When the EPTT is stopped, remember to change the knob of pace-regulating potentiometer back again to the scale 50 and then push the quit button.
6.12 Pressure-evidence examination of spare parts inside frequency changer is forbidden.
6.thirteen The important of EPT manage box of this EPTT is retained by its operator. And non-operator are not able to function major controlling EPT box.
six.fourteen The electric powered element of this EPTT need to be preserved and repaired by experienced and specialist EPT specialists.
7.Frequent faults and answers
7.one Typical faults and solutions of EPT handle circuit can be observed in table two.

EPT-velocity Braiding EPTT Instruction Whole internet pages
No. Web page
No. Fault Fault reason and answer
1 Switch on EPTT source one.1 Indicating lamp does not mild line stop looses or fuse breaks
two Inching button two.1 Electrical motor are not able to operate instantaneously
2.1.1 Inadequate make contact with of the button
two.1.2 Error of parameter location
2.one.three Fault of frequency changer
2.one.four Bad get in touch with of electric powered motor connection or fault of electric motor
2.1.5 Road blocks at managing component of the system
3 Press the startup button
4 Push the end button
5 EPTT quit are not able to appear when the line breaks 5.1.1 Fault or damage of electronic circuit
5.twelve Mini-relay
five.one.3 Fault of EPTT transformer
five.one.four Damage or very poor make contact with of line-break mini-relay

  in Mogadishu Somalia  sales   price   shop   near me   near me shop   factory   supplier 32*2 High Speed Weaving Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Mogadishu Somalia  sales   price   shop   near me   near me shop   factory   supplier 32*2 High Speed Weaving Machine manufacturer   best   Cost   Custom   Cheap   wholesaler